#819- SR 410/Traffic Ave Interchange Improvements

#819- SR 410/Traffic Ave Interchange Improvements

The City of Sumner's Traffic Ave bridge addition project is about the start up. We will be building a bridge parallel between the existing traffic Ave bridge over 410, and the train tracks. The project also includes reconfiguring the intersections on the North and South side of the bridge along with adding a lane. This [...]
Read more
#818- Woodland Creek Water Quality Retrofit

#818- Woodland Creek Water Quality Retrofit

Job #818 is for the Pierce County Planning and Public Works Dept. and the Washington State Dept. of Ecology. We will be constructing a two cell stormwater treatment wetland. This wetland will be a sediment removal location for water that flows down Woodland Creek and deposits into Clarks Creek. Giving Clarks Creek the highest quality [...]
Read more
#816- Arterial Asphalt and Concrete Package

#816- Arterial Asphalt and Concrete Package

This road construction is for the City of Seattle DOT. Job description includes; Asphalt pavement milling & overlay, localized pavement base repair, replace and install new curb ramps, sidewalk repairs, install bus islands, install necessary drainage structures, install new traffic signal & modify existing traffic signal and lighting, and install channelization and protective bike lane. [...]
Read more
#813- City of Des Moines, S. 216th

#813- City of Des Moines, S. 216th

Ceccanti is performing a complete overhaul of S. 216th. This project is taking place between 11th Ave S and 20th Ave S on S 216th in Des Moines, WA. Improvements to be done include; Clearing, grubbing, roadway and structure excavation, paving, storm drain improvements, overhead utility conversion, irrigation, landscaping, fencing, property restoration, illumination system installation [...]
Read more
#810- River S Bridge Replacement

#810- River S Bridge Replacement

The scope of this project is building a new, concrete 2 lane bridge that goes over the river and the BNSF Railroad. It will replace the wooden single lane bridge into the reserve. This project is in Ridgefield, WA and is scheduled for completion in mid 2020. Keep up with the project at https://www.facebook.com/Ceccantiinc/ Subscribe to [...]