#684 - Canyon Substation
Project Details
Owner: City of Tacoma - Tacoma PowerContact: Kirk Kessler
Contract Value: 2,547,533.00
Date Completed: 7/30/10
Location: Tacoma, WA
Major Subcontractors:
Corona Steel, Inc.
Fine Painting & Allied Service
Keystone Masonry, Inc.
Malcom Drilling Co., Inc.
Meyer Brothers Roofing
Owl Fencing, Inc.
Pacific Coast Steel
Paramount Electric Co., Inc.
Canyon Substation
Description
This project includes the civil construction of a transmission-level electrical substation. This substaion is composed of two major phases: (1) substation civil construction and (2) construction of 2,700 SF control house.
Substation Civil Construction:
Clearing and stripping, excavation, grading, various underground utilities, erosion and sediment control, fencing, lighting, conduit, and grounding.
Control House Construction:
Foundation preparation, reinforce concrete foundation and sidewalks, steel roof joists, metal roof deck, HVAC, building electrical, septice system, and plumbing fixtures.